San Engineering performed the independent design check of the substructure for the new bridge carrying US 36 over Comanche Creek for CDOT Region 1.
The analysis involved detailed structural evaluation of pier caps, abutment cap beams and caissons. Also a part of the project was a detailed Quality Control review of the associated substructure construction plans.