The existing bridges carrying I-70 over US Hwy. 6 and the Eagle River have exhibited fatigue cracking in the steel girders resulting in a lowered sufficiency rating.
San Engineering performed inspections of non-girder elements of the bridge as part of the detailed structure assessment and structure selection report provided to CDOT Region 3.