San Engineering is currently working on the design of a freight train bridge over Kipling as part of the design/build effort of the Gold Line for the Regional Transportation District.

The Gold Line is an 11.2-mile electric commuter rail corridor that will run from Denver Union Station to Wheat Ridge, CO and will have seven stations.